← All technical articles · News
Industry Insights
Chassis Weld Quality Control: A Supplier Audit Checklist for Trailing Arms, Subframes and Suspension Brackets


On 6 November 2026, China’s State Administration for Market Regulation published recall S2026M0146V. Chery will recall 53,882 Tiggo 5x and Omoda vehicles built from 6 June 2022 to 31 December 2023, starting 27 November 2026. The stated cause is a rear-axle manufacturing problem: the weld between the trailing arm and the sleeve may be incomplete. In an extreme case the weld can fail and separate, and the wheel can lose control [1]. The fix is to check the rear-axle date code and replace the axle if it is in the suspect batch [1].
The recall does not prove that every welded chassis part is unsafe. It proves that a safety-critical weld can pass a visual check and a line audit and still fail in service when the joint is treated as a bead rather than a process. The buyer’s question is not “does this supplier weld well?” It is: “which records prove that this joint, on this part, was welded inside a qualified window, and how would the supplier contain the problem if that window drifted?”
What the recall changes in an audit
The recall names one joint family, one production period and one containment action. It does not identify a design error, a material error or a wrong welding process. A date-code check also only works if the supplier can connect the finished part to the heat lot, weld cell, WPS revision and inspection record used at the time of production. Welding is a special process: the quality of the joint is built into the part, and final inspection cannot economically prove the absence of every planar defect [3]. Add a weld-specific gate to the supplier audit; do not replace material, dimensional or PPAP controls with it.
Why penetration alone is a weak criterion
Penetration is one output of a chain that starts with joint design and ends with the inspection plan. A weld can meet a penetration target and still contain lack of fusion at the root, a cold lap at the toe, excessive undercut or an unqualified repair. A surface that looks under-filled can still meet the required throat thickness on a partial-penetration fillet.
ISO 5817:2023 sets three quality levels, B, C and D, with B the most stringent [2]. The designer or application standard chooses the level for each joint, and fatigue-loaded welds need the additional criteria in Annex B [2]. NDT follows the same logic: ISO 17635:2025 selects methods from quality requirements, material, thickness, process and testing extent, and its acceptance levels are not a direct interpretation of ISO 5817 [7]. ISO 17636-1 controls radiographic technique and image quality, but the acceptance level comes from the ISO 10675 series [8]. A report without method, technique, testing level and acceptance standard is a certificate of activity, not evidence of conformity.
Six gates for a welded chassis part
| Gate | Evidence to request | What it proves | Red flag |
|---|---|---|---|
| 1. Joint definition | Drawing with weld symbol, joint ID, quality level and acceptance standard | The supplier knows which weld is safety-critical | “Good workmanship” with no level or joint map |
| 2. WPS and PQR | WPS and qualified record covering material, thickness, process, position and heat treatment | The process was proven on a representative joint | A WPS borrowed from another thickness or position |
| 3. Welder and operator | ISO 9606-1 certificates; cell qualification and program control for automated cells | The person or machine is qualified for production variables | Expired certificate or no robot program ownership |
| 4. Fit-up and material | Heat-lot certificate, pre-weld check sheet, gap and alignment records | The welded joint matches the qualified joint | Gap filled with wire; rust or oil in the joint |
| 5. Process window | Per-part record for current, voltage, travel speed, wire feed, gas flow, preheat and fixture ID | The weld stayed inside the qualified window | Parameters changed without a new WPS |
| 6. Inspection and traceability | VT and NDT reports; date code linked to heat lot, cell and WPS revision | The part can be traced and contained by batch | “Visual is enough”; date code not linked to records |
Gate 1: define the joint first
A chassis part can carry ten welds and only two may be fatigue-critical. Issue a weld map with joint ID, weld type, quality level, acceptance standard, failure mode and inspection method. Without it, the supplier cannot tell which weld deserves the cost of NDT, and may apply cosmetic fixes to a non-critical joint while missing a root defect on a safety-critical one.
Gate 2: qualify the procedure, then the welder
ISO 15614-1:2017 qualifies the welding procedure by a procedure test; if the contract does not specify a level, level 2 applies, and a level 2 test qualifies for level 1 but not the reverse [5]. ISO 9606-1:2012 qualifies the manual welder on essential variables including process, product type, weld type, filler, dimensions, position and weld details [6]. A welder qualified flat on plate is not automatically qualified vertical in production. For automated cells, lock the program and require approval for change; CQI-15’s second edition assesses this system and calls for annual reassessment unless the customer says otherwise [4].
Gate 3: control fit-up and incoming material
Most weld defects are created before the arc starts. An excessive gap, a thickness mismatch, a dirty surface or a missing backing bar forces the welder to compensate with wire, heat or travel speed. Follow the part from heat lot to fixture: heat-lot certificate, incoming inspection, pre-weld check sheet and surface-cleanliness standard. Then watch a changeover. The fixture must still locate the joint after a tooling change, a shift change and a new heat lot.
Gate 4: lock the process window and fixture
A WPS is a range, not a suggestion. Require per-part records for current, voltage, travel speed, wire-feed rate, gas flow and preheat, within the qualified range. Without them, the supplier can claim compliance after the fact but cannot prove which part was made outside the window. Fixture wear matters too: clamping sequence, gap control, copper backing and chill blocks change the heat sink and joint geometry. A drifted fixture can produce an acceptable first part and a lack of fusion on the tenth. Ask for fixture maintenance and a first-off/last-off check.
Gate 5: choose inspection by failure mode
Visual testing is the first filter, not the final proof. Surface-breaking cracks, undercut, excessive convexity and spatter can be seen; lack of fusion and root defects usually cannot [2][7]. For a fatigue-critical fillet or T-joint, ultrasonic testing is generally better for planar lack of fusion; radiographic testing is better for volumetric porosity and inclusions. ISO 17636-1 covers the technique, not the acceptance level [8]. The NDT report should state method, technique, testing level, sampling plan, acceptance standard and the result for each joint ID. “Passed NDT” is not a record. A periodic macro section or bend test should be linked to the same WPS and heat lot as production.
Gate 6: make the date code traceable
The recall remedy is a date-code check [1]. That only works if the code resolves to production date, shift, weld cell, WPS revision, heat lot, NDT record and repair history. If it identifies only a production month, the supplier cannot contain a narrow batch without replacing a much larger population. A supplier that can link a suspect weld to one cell and one heat lot can contain the problem with a targeted check; one that cannot must treat every unit as suspect. Test the system with a real part number, not a flowchart.
Six questions for the RFQ
- Which joints are safety-critical, and what quality level and acceptance standard apply to each?
- Can you provide the weld map, WPS and qualified procedure record for our material, thickness and position?
- Are the welders qualified to ISO 9606-1 for the actual position and joint type?
- For automated cells, who owns the program, how is it locked, and how is a change approved?
- Which NDT method is used for each joint, at what sampling frequency and acceptance level?
- What does the date code resolve to, and can you demonstrate a mock containment for one lot?
About Hetian
Hetian has supplied chassis components since 1998 from a 160,000 m² manufacturing base, with IATF 16949 certification, CNAS laboratory capability, more than 100 patents and export experience in over 30 countries. Its public control-arm range includes stamped steel arms such as H11-4057 for Audi 80/90 and Volkswagen Passat B2 applications. The photo above is that stamped steel arm; the same joint-control logic applies to trailing arms, subframes and suspension brackets. Buyers can review the control arm range or send a drawing and weld specification for review.
FAQ
Does every chassis weld need radiographic testing?
No. NDT method and extent should follow the failure mode, joint quality level and risk. ISO 17635:2025 is the selection framework, not a mandate for 100% RT [7].
Can a weld pass visual inspection and still fail?
Yes. Visual inspection cannot reliably detect subsurface lack of fusion, root cracks or incomplete penetration. That is why WPS, fit-up and process records matter before inspection [2][7].
What ISO 5817 level should a suspension bracket use?
The designer or application standard should set it by joint and load case. B is the most stringent, but not automatically required for every fillet; fatigue-loaded joints need Annex B criteria [2].
Is ISO 3834 the same as IATF 16949?
No. ISO 3834-1 defines quality requirements for fusion welding and is complementary to a quality management system, not a replacement for IATF 16949 [3]. CQI-15 is the automotive welding system assessment used alongside it [4].
How do I know a WPS covers my part?
Compare the qualified range: material group, thickness, process, joint type, position, preheat and post-weld heat treatment. A certificate without the range is not enough [5].
Related Guides
- How a Ball Joint Is Made: Forging, Machining and Heat Treatment
- Chassis Fastener Torque Control: A Supplier Audit Checklist
- Chassis Part Corrosion Protection: Coating Systems and Salt Spray Hours
- Control arm product range
References
[1] 奇瑞汽车股份有限公司召回部分奇瑞瑞虎5x、欧萌达汽车, 国家市场监督管理总局, 2026-11-06, https://www.samr.gov.cn/zw/zh/art/2026/art_5b9ab6e6504647c7884b92ea0ad16436.html, accessed 2026-11-26.
[2] ISO 5817:2023, Welding — Fusion-welded joints in steel, nickel, titanium and their alloys — Quality levels for imperfections, ISO, 2023-02, https://www.iso.org/obp/ui/en/#!iso:std:80209:en, accessed 2026-11-26.
[3] ISO 3834-1:2021, Quality requirements for fusion welding of metallic materials — Part 1: Criteria for the selection of the appropriate level of quality requirements, ISO, 2021, https://www.iso.org/standard/81650.html, accessed 2026-11-26.
[4] CQI-15 Special Process: Welding System Assessment, 2nd Edition, AIAG, 2019-11, https://www.aiag.org/quality/special-process-assessments/welding, accessed 2026-11-26.
[5] ISO 15614-1:2017, Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 1: Arc and gas welding of steels, ISO, 2017-06, https://www.iso.org/standard/51792.html, accessed 2026-11-26.
[6] ISO 9606-1:2012, Qualification testing of welders — Fusion welding — Part 1: Steels, ISO, 2012-07, https://www.iso.org/standard/54936.html, accessed 2026-11-26.
[7] ISO 17635:2025, Non-destructive testing of welds — General rules for metallic materials, ISO, 2025-04, https://www.iso.org/standard/85705.html, accessed 2026-11-26.
[8] ISO 17636-1:2022, Non-destructive testing of welds — Radiographic testing — Part 1: X- and gamma-ray techniques with film, ISO, 2022-07, https://www.iso.org/standard/78319.html, accessed 2026-11-26.
Last updated: Nov 26, 2026 · Reviewed by the Hetian engineering team